Risk-indexed artificial neural network for predicting duration and cost of irrigation canal-lining projects using survey-based calibration and python validation.

Boshra Taha, Ahmed H Ibrahim, Asmaa A Soliman

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

3 authors.

Boshra TahaIndustrial Engineering Department, College of Engineering, King Khalid University, P.O. Box 394, Abha, 61421, Saudi Arabia. Boshrataha@zu.edu.eg.
Ahmed H IbrahimConstruction Engineering and Utilities Department, Zagazig University, Zagazig, 44519, Egypt.
Asmaa A SolimanCivil Engineering Department, Higher Technological Institute (HTI), 10th of Ramadan, 44629, Egypt.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

The purpose of this study is to develop and validate a risk-driven predictive model for estimating project duration and cost in irrigation canal lining projects, where uncertainties often lead to delays and budget overruns. Ninety-three factors were first reduced to twenty using AHP-RII (Cronbach's [Formula: see text]). A multi-layer perceptron (128-64-32, ReLU, Adam, early stopping) was trained on 5000 simulated scenarios and validated on eight projects with leave-one-project-out cross-validation. The model had [Formula: see text] (training), 0.82 (testing), and made errors within the limits of 0.87 months (time) and EGP 102,500 (cost) on average.The developed model was deployed as a Python-based desktop application, enabling engineers and planners to generate accurate time and cost forecasts during early project stages. This research introduces an integrated ANN-based framework that combines expert-driven risk assessment with machine learning, providing a practical decision-support tool for infrastructure projects.

Indexed as

CalibrationIrrigation infrastructureLatin hypercube samplingMulti-layer perceptron (MLP)Relative importance index (RII)Sensitivity analysis

Identifiers

PMID41249387
PMCPMC12623735

What Socratic holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the Socratic graph.